The Project · Omaha Metro, NE

50,000 sq ft restored — without stopping the line.

A failing roof over a plant that runs every day — restored watertight in stages, without the line ever stopping. Here's what that took.

← All projects
The Project
How It Went

Challenge, approach, result.

Challenge

Keep production running

A roof past its service life over a plant that never stops. Water was getting in — and the fix couldn't cost them a single hour of production.

Approach

Coat it in stages

We mapped the roof with a walk and moisture scan, dried and repaired the wet areas, then built up a seamless reflective coating bay by bay — sequenced around the production schedule.

Result

Zero shifts lost

50,000 sq ft sealed and renewed for a fraction of a replacement — with a reflective surface that eases the summer cooling load, a fresh warranty, and no old roof sent to a landfill.

Building
Manufacturing plant
Roof system
Reflective restoration coating
Coverage
50,000 sq ft
Production downtime
None

Why it mattered to them

For a facility manager, the scariest part of a roof problem usually isn't the roof — it's the disruption. A tear-off means noise, debris, exposed interiors, and days the line isn't running. That risk is often what keeps a failing roof in service far too long.

Restoration took that risk off the table. The plant kept shipping while we worked overhead, the bill came in well under a replacement, and the reflective finish now works in their favor every summer — lower roof temps, less load on the coolers. Same building, longer life, none of the drama.

Ready to See Your Own Numbers?

Get the facts. Make the call.

A free roof walk tells you exactly what's going on with your roof — no pressure, no eye-rolling sales pitch, just honest answers.

Real people · Fast answers · No call center in between