The Project · Bossier City, LA

62,000 sq ft of TPO — sealed in under two weeks.

A large TPO membrane roof restored end to end in under two weeks — watertight and renewed without pulling the building out of service. Here's how.

← All projects
The Project
How It Went

Challenge, approach, result.

Challenge

Handle it fast

62,000 sq ft of TPO on the way down, and an owner who needed it handled fast — without a drawn-out project hanging over the building.

Approach

A tight, staged crew

We cleaned the membrane, reinforced every seam and detail, and rolled a seamless reflective coating across the whole roof — a tight, well-staged crew keeping the whole job under two weeks.

Result

Renewed in under two weeks

62,000 sq ft watertight and renewed in under two weeks — a reflective surface for the Louisiana heat, a fresh warranty, and no tear-off, no landfill.

Building
Commercial building
Roof system
TPO membrane restoration
Coverage
62,000 sq ft
Timeline
Under 2 weeks

Why it mattered to them

A roof project can feel like it drags on forever — weeks of crews, staging, and uncertainty over the building. The longer it runs, the more it costs and the more it disrupts whatever happens underneath.

Restoration compressed all of that. In under two weeks the membrane was sealed, reflective, and warrantied — for far less than a replacement, with the building fully in use the whole time. Fast, clean, and done before it became a headache.

Ready to See Your Own Numbers?

Get the facts. Make the call.

A free roof walk tells you exactly what's going on with your roof — no pressure, no drawn-out sales pitch, just honest answers.

Real people · Fast answers · No call center in between